Choose Product
Select your product, size, and add-ons that best match your needs.
Select your product, size, and add-ons that best match your needs.
Upload your artwork or request design assistance before placing your order.
Complete checkout, receive a proof, and approve the final artwork.
We print your approved order and ship it directly to your doorstep.
Put your brand under the spotlight with the 3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV. Designed for 3m wide booths, this portable exhibit display combines an S-shape display, a sloped arch display, a rectangle counter, a shelf stand, a TV mount, and graphic prints to create a fully personalised, interactive presence that catches the eye of anyone walking by.
Built with aluminium bungee-corded frames and two wide steel bases, the kit pairs wrinkle-resistant 260 gsm polyester tension fabric with dye sublimation CMYK printing for vibrant, high-impact visuals. Tool-free assembly, lightweight portable components, and soft nylon carry bags make it well suited for brands that want a distinctive modular display.
Dye sublimation CMYK printing
Fire retardant and machine washable fabric
Aluminium bungee-corded frames with two wide steel bases
Nylon carry bag
| Component | Frame Dimensions | Graphic Dimensions | Package Dimensions | Additional Details |
|---|---|---|---|---|
| Portable Exhibit Display - S shape | 1m wide x 2.7m height | 1000mm wide x 2580mm height | 27cm x 27cm x 74cm | |
| Portable Exhibit Display (Rampant) | 2m wide x 2.3m/2.5m height | 2000mm wide x 2280mm/2524mm height | 65cm x 35cm x 10cm *1pcs | |
| Rectangle Counter | 0.8m Wide x 1m Height x 0.5m Depth | 2200mm width x 1025mm height | 84cm x 12cm x 58cm | |
| LED Light with Light Holder | Material: Aluminium, LED bulbs; Adapter: 12V / 1.5A / 3.5m wire; Power: 5W, 700LM |
Total Weight: 35kgs.
Product Specifications
If you would like to supply your own designs, artwork files are accepted when they meet the specifications below. For website uploads, please keep the file size below 50 MB. If the file size exceeds 50 MB, files can be shared through systems such as WeTransfer, Dropbox, or Google Drive. Free design services are also available, and designs or ideas can be emailed to support@backdropsource.in.
| Category | Specification |
|---|---|
| File Formats | .eps, .png, .jpg, .bmp, .gif, .psd, .cdr, .pdf, .tif, .tiff, .ppt, .ai |
| Artwork | Any size of your choice |
| Font Format | No bleed, no crop marks, only outlines fonts |
| File | If Photoshop, please provide a flattened file only |
| Resolution | 150 dpi resolution at 100% of the final print size |
| File Size | Below 50 MB for website uploads |
View More
"3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV" is a portable exhibit display for 3m wide booths that includes an S-shape display, a sloped arch display, a rectangle counter, a shelf stand, a TV mount, clamping LED lights, and graphic prints on wrinkle-resistant 260 gsm polyester tension fabric. Built with aluminium bungee-corded frames and dye-sublimation CMYK printing, it offers tool-free assembly, single- or double-side graphics, and soft nylon carry bags for transport. It serves exhibitors who want a fully personalised, interactive display with a distinctive modular shape.
This booth kit is commonly used across a range of branded booth environments, including: